Aashiyana® SPRINT 21

Real Estate Projects Plan & Smart Booking

Unified Site Plan Experience 5.1 — Clean Satellite GIS Background (FINAL TARGET)

Sprint 12 (2D CAD) + Sprint 15 (True 3D) + Sprint 17 (GIS) + Sprint 19 (Runtime) + Sprint 20 (Integration) → Sprint 21 (Clean BG)

RMG Software® Smart Software Solutions
SUPER SHIELD (Additive Only) ← Sprint 20 Admin Hub
🏛️
Projects 3
🌐
Sectors 12
📁
Blocks 48
📐
Plots (Total) 2,456
🟢
Available 1,948 (79.3%)
⏳
Held 65 (2.6%)
🔒
Reserved 128 (5.2%)
📅
Booked 246 (10.0%)
🏢
Allotted 27 (1.1%)
🚫
Blocked 42 (1.7%)

Aashiyana Township – Sector 01 – Block B (Unified 3-View)

Interactive & Synchronized: 2D CAD Plan + True 3D (Extruded) + Satellite/GIS (Clean Orthophoto + Vector Overlay)

📐 2D CAD Layout Plan Active
HANUMANGARH ROAD (80' WIDE HIGHWAY) ROAD 40' WIDE ROAD 40' WIDE ROAD 40' WIDE ROAD 30' WIDE ROAD 30' WIDE CENTRAL PARK 120' X 130' 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 26 25 25 26 24 27 23 28 22 29 21 30 20 31 19 32 18 33 17 34 16 35 15 36 37 14 38 13 39 12 40 11 41 10 42 9 43 8 44 7 45 6 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 11 12
48 Plots • S12 Baseline
🧊 True 3D — Extruded View Active
▲
S15 Volumetric Engine
🛰️ Satellite / GIS (Clean Background + Vector Overlay) Active
▲

GIS Layers

Opacity 85%
Pure Clean Satellite Orthophoto Basemap CENTRAL PARK 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 26 25 25 26 24 27 23 28 22 29 21 30 20 31 19 32 18 33 17 34 16 35 15 36 37 14 38 13 39 12 40 11 41 10 42 9 43 8 44 7 45 6 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 11 12
Plot B-12 BOOKED
Area: 2,400.00 Sq.Ft.
Dimensions: 40 Ft × 60 Ft
Customer: Mr. Rajesh Sharma
Ledger: ₹ 9,00,000.00 Dr
📍 Lat: 29.9142° N | Lon: 73.8821° E Esri/Maxar Licensed Orthophoto (Cleaned)

📍 Sprint 21 — Target Output: Background Purification

✖ Before (Composite BG)
Before Composite BG
➔
✔ After (Clean BG - Target)
After Clean BG Target

📋 Sprint 21 — Summary (Done vs Pending)

# Deliverable / Feature Status
1 Clean satellite background (no buttons/labels) ✔ Done
2 Dynamic GIS overlays (plots, numbers, status colours) ✔ Done
3 GIS controls (zoom, compass, fit, reset) ✔ Done
4 Layer toggles (7 layers) + opacity ✔ Done
5 2D, 3D and GIS synchronization ✔ Done
6 Alignment & scaling verification ✔ Done
7 Documentation & asset manifest ✔ Done
8 Regression test (no impact on S12/S15/S20) ✔ Done

🎯 ED Target Result (Sprint 21)

  • ✔ Clean orthophoto background (no fixed/static elements)
  • ✔ All plot, road, park and status information rendered dynamically
  • ✔ Three-view (2D, 3D, GIS) with real-time synchronization
  • ✔ Accurate alignment, smooth zoom & pan
  • ✔ 100% reuse of S12 (2D) and S15 (3D) with S20 runtime
  • ✔ Zero data loss, zero regression, SUPER SHIELD compliance
  • ✔ Ready for ED validation and next sprint (Sprint 22)